Stock image for this method, not a photo of this project. Developers can send their own, see Claim.
SWS Pyrolysis Power Plant
Südwestdeutsche Salzwerke AG
Salt producer operating a pyrolysis power plant at its Heilbronn site, Baden-Württemberg, which produces biochar alongside energy for salt production. The Global C-Sink registry lists project GCSP1139 as validated, with 2,714 tonnes of CO2e in C-sinks issued in 179 batches between December 2024 and June 2026. Carbon Standards International has applied for CRCF recognition; until it is granted, these are not CRCF units.
Questions about this listing? Email us at
The class the CRCF sets for this activity type, not the term of this project. StatusRegistry-verified · Global C-Sink (Carbon Standards International), GCSP1139 Websitewww.salzwerke.de SourceGlobal C-Sink registry, project GCSP1139 Last checked2026-10-21 ListingCompiled by CRCFProjects from public sources EvidenceGlobal C-Sink registry: project GCSP1139 validated, 2,714 tonnes of CO2e in C-sinks issued in 179 batches between December 2024 and June 2026
This profile was compiled by CRCFProjects from public sources. The developer has not checked it, and the status is not independently verified by us. No project holds a CRCF certificate yet, and the first units are expected in 2027.
Is this your project? Claim or edit this listing → How it works